Customer stories.
Outcomes from process plants that moved from spreadsheet schedules to one live plant model. Named and anonymised stories.

A shared-equipment API site freed enough capacity for five extra CDMO batches a year
A major European pharma manufacturer ran commercial and CDMO production on shared equipment, planned in Excel. Bodhee Production Scheduling, deployed as a Control Tower, cut commercial lead time 2.5% and freed capacity for five extra CDMO batches a year.

Scheduling people, not FTEs: a multi-line API site's path to 20% capacity unlock
A multi-line API manufacturing site moved from static Excel scheduling to operator-level allocation on Bodhee — naming the operator, honouring per-shift compliance limits, and using the same model to surface a 20% capacity unlock via what-if scenarios.

Productivity recovered across multiple APUs at a large-scale European API plant
How a leading European Active Pharmaceutical Ingredient provider replaced annual sales-projection plans with event-driven, AI-generated schedules across its autonomous production units — measurable productivity gains within 8–12 weeks of go-live.

10–15% Equipment Utilisation Uplift: rebuilding production scheduling at a major European API manufacturer
A European API manufacturer retired its in-house planner for Bodhee Production Scheduling — lifting equipment utilisation 10–15% and productivity 8–10% once shelf-life, lockstep, and cross-building dependencies entered the model.