Bodhee

BODHEE · MANUFACTURING SCHEDULING

A schedule that adapts the moment your plant does.

Production, Quality, and Maintenance — synchronised on one live model of your plant. Constraint-aware. Continuously replanning.

  • ISO 27001 certified
  • Live in 50+ Lines
  • Deployed in 12–16 weeks
Bodhee Adaptive ReschedulingLive
Upstream Plant overrun
UpstreamPlant 01DownstreamPlant 02QualityQC Lab 01MaintenancePlant 01 MXBODHEEAdaptiveScheduling
One event in. Schedule replanned across functions.
THE PROBLEM

Your schedule is already wrong by 9 a.m.

Process plants plan on Sunday night and spend the week firefighting Monday's assumptions. Every outage, deviation, or priority order sends planners back to spreadsheets — and the floor waits. Three structural pains keep the cycle running, and they compound each other every shift.

01 · Rigidity

Schedules written for a plant that doesn't exist yet.

The moment the real plant starts running, they break. A campaign extends. A reactor goes down. A batch gets held in QC. The schedule freezes; the plant doesn't. Someone spends the morning rebuilding a spreadsheet everyone stopped trusting by 10 a.m.

02 · Capacity loss

Most of your lost capacity is scheduling-shaped, not machine-shaped.

Typical OEE in regulated process manufacturing sits between 35% and 65% — against a world-class benchmark of 85% (industry-reported). Equipment availability often runs below 50% of staffed time.

03 · Static plans

The pain nobody owns — and the one that compounds the other two.

Production, Quality, and Maintenance plan independently on schedules that can't replan. One changes; the other two don't find out until Monday. That cross-functional drift accounts for roughly 10–15% of capacity loss in process plants (directional industry estimate).

These three pains can't be solved separately. So Bodhee was built as a product family that solves them together.

Meet Bodhee.

Bodhee is an enterprise SaaS product family for process manufacturing scheduling. Three products sharing one live model of your plant — so changes in any product ripple to the others instantly. All three are grounded in the Bodhee Process Digital Twin. See how the Digital Twin works →

PRODUCTION

Production scheduling that reacts in seconds, not shifts.

Bodhee Production Scheduling synchronises your entire production stack — lines, equipment, manpower, material and shared utilities — against the full constraint universe. When something breaks, the schedule rebuilds itself within minutes. Planners stop rebuilding by hand. Operators stop guessing what's next. The plant stops losing hours to the gap between plan and reality.

  • Constraint-aware rescheduling across machine, material and manpower
  • Dynamic bottleneck management in real time
  • Minute-level schedule granularity
  • Live event registry across ERP, MES, EAM, QMS, LIMS, and SCADA
Bodhee · schedule snapshot
Snapshot
Production line
18:0020:0022:0000:0002:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:0000:0002:0004:00
Line 01 — Granulation
Line 02 — Compression
Line 03 — Coating
Line 04 — Packaging
Line 05 — QC Lab
B-4812
B-4815
B-4813
B-4816
B-4814
B-4812
B-4815
B-4813
B-4816
B-4819
B-4818
B-4821
B-4823
B-4826
B-4819
B-4822
B-4824
B-4817
B-4820
B-4823
B-4818
B-4821
B-4823
B-4826
B-4822
B-4824
B-4820
B-4827
B-4812
B-4815
B-4813
B-4816
B-4814
B-4812
B-4815
B-4813
B-4816
B-4819
B-4818
B-4821
B-4823
B-4826
B-4819
B-4822
B-4824
B-4817
B-4820
B-4823
B-4818
B-4821
B-4823
B-4826
B-4822
B-4824
B-4820
B-4827
B-4812
B-4815
B-4813
B-4816
B-4814
B-4812
B-4815
B-4813
B-4816
B-4819
B-4818
B-4821
B-4823
B-4826
B-4819
B-4822
B-4824
B-4817
B-4820
B-4823
B-4818
B-4821
B-4823
B-4826
B-4822
B-4824
B-4820
B-4827
Current plan

82 batches scheduled

Wednesday 06:00 – 18:00 · on-time 94%

ProductionChangeoverQC hold

All three products share the Bodhee Process Digital Twin. That's why an event in one triggers synchronised rescheduling in the others. How Bodhee works →

How Bodhee gets deployed.

Bodhee is designed to deploy alongside your existing stack — ERP, MES, LIMS, CMMS, SCADA — without rip-and-replace. Most deployments follow the same four-phase pattern.

  1. Phase 1

    Discovery & Assessment

    Scheduling-maturity assessment of the target plant. Pain mapping across production, quality, and maintenance. Integration inventory of your existing stack. Deployment roadmap and ROI model.

  2. Phase 2

    Configuration & Integration

    Plant-specific configuration at line-level granularity. Integration with your ERP, MES, EAM, HRMS, LMS, QMS, and LIMS. Master data enrichment — the Digital Twin gets built against your plant's actual constraints.

  3. Phase 3

    Iterative Implementation

    Parallel run alongside your current scheduling process. Validation against real plant behaviour. Planner and operator training. Model calibration against shift-by-shift patterns the plant actually produces.

  4. Phase 4

    Go-Live & Continuous Improvement

    Bodhee becomes the primary scheduling system for the plant. Agent feedback loop tightens decision quality. Quarterly reviews against actual-versus-scheduled performance. Additional Bodhee products deploy when the plant is ready.

Specific integrations and deployment sequence vary by product. See each product page for detail.

BUILT FOR YOUR PROCESS

Built for the plants we know best.

Bodhee doesn't sell a generic MES add-on. It ships with domain knowledge for process manufacturing — where equipment is expensive, campaigns are long, regulatory stakes are high, and a single scheduling misstep can cost a batch.

API Manufacturing

Campaign sequencing for active pharmaceutical ingredient lines. Cleaning validation, intermediate hold times, and multi-product changeovers built into the schedule.

CDMO

Multi-client scheduling with strict chain-of-custody and segregation. Slot allocation across competing programmes without compromising release timelines.

Technical Research

Pilot-scale and tech-transfer scheduling that respects scarce equipment and analyst windows. Bridges development to commercial manufacturing.

Vaccines

Cold-chain-aware scheduling for vaccine manufacturing. Filling lines, single-use coordination, and CBER-aligned documentation across drug substance and drug product.

Biotech

Cell and gene therapy scheduling with chain-of-custody preservation. Single-use system coordination. CBER-aligned documentation support.

Specialty Chemicals

Multi-purpose reactor scheduling with campaign sequencing. Cross-contamination rules enforced at the scheduling layer. Handles batch-to-continuous hybrid flows.

Food & Beverage

FSMA and HACCP-aligned scheduling. CIP/SIP cycle optimisation. Allergen changeover management. Shelf-life-driven sequencing that maximises freshness without sacrificing throughput.

Metals

Campaign sequencing for energy-intensive operations. Bottleneck management against furnace and mill constraints. Scheduling that respects the true duration of heat treatment and finishing.

RESULTS

ROI you can point at in a board meeting.

Across Production, Quality Control, and Maintenance scheduling — what process manufacturers see with Bodhee, at the scale we've delivered it.

0–15 pp

OEE gain

across regulated process manufacturing

0–25%

On-time delivery

across regulated process manufacturing

0–80%

Scheduling effort

planner time before / after

Hours → Minutes

Rescheduling cycle

live, during shift

12+years in operation50+production lines managed6+industries served

Typical OEE in regulated process manufacturing: 35–65% (industry-reported) · Cross-functional scheduling misalignment costs 10–15% of capacity (directional) · Unplanned downtime: ~USD 150K / hour (Siemens / Senseye)

Based on Neewee deployment observations in regulated process manufacturing. See product pages for product-specific outcomes.

Trusted by manufacturers worldwide

  • GSK logo
  • EuroAPI logo
  • UPL logo
  • Portescap logo
  • ABB logo
  • Titan logo
  • Tata Steel logo
  • Sesa Goa logo
  • Vedanta logo
  • ITC logo

See Bodhee running on a plant like yours.

30-minute tour with a solutions engineer who has actually shipped a pharma or specialty-chemical scheduler. No slide decks unless you ask.