Bodhee
Adaptive Scheduling · API Manufacturing

API Manufacturing Scheduling
built around cleaning and hold-times.

When a cleaning validation window shifts, a hold-time expires, or QC clears a batch, Bodhee rebuilds a feasible campaign schedule in minutes across production, quality, and maintenance. Built for cGMP active pharmaceutical ingredient manufacturing.

Bodhee is the Adaptive Scheduling product family from Neewee, built for cGMP API plants. It rebuilds schedules against live constraints, alongside your MES, ERP, and LIMS.
The challenge

Why scheduling breaks in API manufacturing.

A long, multi-step API campaign runs on constraints most planning tools never model. Each gap costs capacity, yield, and scrapped intermediates.

01

Campaigns live and die on sequencing

Multi-step API campaigns must be sequenced to respect intermediates, equipment trains, and changeovers. Sequenced wrong, capacity evaporates.

02

Cleaning validation blocks the train

Cleaning validation and line clearance between products consume large blocks of equipment time, and legacy planning treats them as an afterthought.

03

Hold-times and shelf-life box you in

Intermediates carry hold-time and shelf-life limits. Miss the window and a batch is scrap, but static plans cannot see the clock.

04

QC release gates the next step

A step waits on in-process or release testing and the whole train stalls. The production plan cannot see the lab, so the delay surfaces late.

05

Production, QC, and maintenance plan apart

Three functions plan on separate schedules that cannot replan together, so a hold or a maintenance window cascades into scrapped intermediates.

How Bodhee solves it

One live schedule for the whole API train.

Bodhee holds the full train, production, quality, and maintenance on one live model, so a change in one step replans the rest automatically.

One live model of the whole train.

The full API train, production, quality, and maintenance share one live model, so a change in one step replans the rest automatically, before an intermediate ages out.

Hold-times and cleaning, honoured by design.

Hold-time and shelf-life limits, cleaning validation windows, and line clearance are modelled as first-class constraints, so the plan respects the clock instead of ignoring it.

Rescheduling in minutes, not shifts.

AI agents watch the floor and the lab, classify events, and invoke the scheduling engine within minutes, so a QC hold does not quietly scrap a batch downstream.

What it does for API plants

Scheduling built around campaigns, cleaning, and the clock.

01

Campaign and batch sequencing

The right order, every train.
  • Sequence multi-step campaigns across shared equipment trains
  • Honour intermediate, changeover, and cleaning constraints
  • Respect equipment qualification and line-clearance status
02

Hold-time and shelf-life awareness

Beat the clock on every intermediate.
  • Model hold-time and shelf-life limits as live constraints
  • Flag at-risk intermediates before they age out
  • Sequence to minimise waiting between steps
03

QC-release-aware replanning

The plan that sees the lab.
  • Replan the train around in-process and release testing
  • Sync QC analyst and instrument capacity with batch flow
  • Surface release-timing risk before it stalls the train
04

Cross-functional resynchronisation

One event, one coordinated replan.
  • Propagate events across production, quality, and maintenance
  • Assess cross-functional impact before committing
  • Configurable response modes, from advisory to automatic
Trust & compliance

Built for GxP-regulated API manufacturing.

Bodhee runs alongside your validated MES, eBR, QMS, and LIMS, and provides the technical and documentary controls your validation team expects. Compliance is achieved by the validated system at your site, not by the software alone.

ISO/IEC 27001
Certified ISMS, whole-organisation scope
21 CFR Part 11
Audit-trail-aligned, closed system
EU GMP Annex 11
Audit-trail-aligned
GAMP 5
Category 4 configured product
Data integrity
ALCOA+, append-only audit trail
Access control
RBAC with SSO and SAML

Electronic signatures are not supported by design; they are executed in your systems of record such as MES, eBR, QMS, and LIMS. Cloud-infrastructure attestations are inherited from Google Cloud Platform, not claimed as our own.

Explore the Trust Center →

Measurable outcomes

What Bodhee delivers in API plants.

Ranges observed across regulated process manufacturing deployments. Outcomes vary by plant complexity, data maturity, and integration scope.

0–15 pp

OEE improvement

across regulated process manufacturing deployments

0–25%

Changeover efficiency

from campaign- and changeover-aware sequencing

0–20%

WIP inventory

through tighter schedule execution and less waiting

0–25%

On-time delivery

from more reliable schedule execution

Hours → Minutesrescheduling cycle time−60–80%planner scheduling effort+10–15%cross-functional capacity recovery

Bodhee runs live pharmaceutical and process manufacturing production today, across multiple sites and countries. Live deployments, not pilots.

Based on Neewee deployment observations in regulated process manufacturing.

Frequently asked questions

API manufacturing scheduling, answered.

The questions API planners, quality leads, and IT teams ask before a pilot.

01

API manufacturing scheduling

How Bodhee sequences cGMP API campaigns around cleaning, hold-times, and QC release, and fits your validated systems.

8 questions

manufacturing scheduling software plans and sequences multi-step campaigns for active pharmaceutical ingredients, honouring the constraints that make API production hard: equipment trains, cleaning validation, product-to-product changeovers, intermediate hold-times and shelf-life, and quality-release timing. Bodhee does this as , rebuilding a feasible plan continuously as the plant and the lab change.

Ready to schedule your API train as one?

A 30-minute tour of Bodhee for API manufacturing: the engine, the cross-functional layer, and how it fits your MES, ERP, and LIMS.