Bodhee
Adaptive Scheduling · Specialty Chemicals

Specialty Chemical Production Scheduling
that keeps pace with a high-mix plant.

When a campaign resequences, a changeover runs long, or a reactor frees up early, Bodhee rebuilds a feasible schedule in minutes across production, quality, and maintenance. Built for high-mix batch and continuous specialty chemical plants.

Bodhee is the Adaptive Scheduling product family from Neewee, built for high-mix specialty chemical plants. It rebuilds schedules against live constraints, alongside your ERP, MES, and LIMS.
The challenge

Why scheduling breaks in specialty chemicals.

A high-mix chemical plant runs on constraints most planning tools never model. Each gap costs capacity, effort, and on-time shipments.

01

A high-mix book means constant changeovers

Hundreds of products across shared reactors and trains mean relentless product-to-product changeovers and cleaning, and legacy planning treats that lost time as invisible.

02

Campaign sequencing is a manual puzzle

Sequencing campaigns to minimise changeovers, respect grade transitions, and honour material compatibility is done by hand, and it breaks the moment reality shifts.

03

Process-safety and EHS limits box you in

Hazardous-material handling, segregation, and process-safety windows constrain what can run when, but static plans cannot see those limits.

04

Lab results gate release and shipment

A batch waits on lab results before it can move or ship, and the production plan cannot see the lab, so the delay surfaces late.

05

Production, QC, and maintenance plan apart

Three functions plan on separate schedules that cannot replan together, so a lab hold or a maintenance window cascades into missed shipments.

How Bodhee solves it

One live schedule across a high-mix plant.

Bodhee holds production, quality, and maintenance on one live model of your site, so an event in one function replans the others automatically.

One live model of the plant.

Production, quality, and maintenance share one live model of your site, so a change in one function replans the others automatically, not at the next planning meeting.

Changeovers and compatibility, honoured by design.

Grade transitions, cleaning, material compatibility, and segregation are modelled as first-class constraints, so campaigns sequence to cut changeovers instead of ignoring them.

Rescheduling in minutes, not shifts.

AI agents watch the floor and the lab, classify events, and invoke the scheduling engine within minutes, so a disruption in one unit does not quietly derail the rest.

What it does for chemical plants

Scheduling built around a high-mix, changeover-heavy plant.

01

Campaign and changeover-aware sequencing

High mix, fewer changeovers.
  • Sequence campaigns to cut changeover and cleaning
  • Honour grade transitions and material compatibility
  • Respect segregation and equipment-cleaning status
02

Process-safety and EHS-aware planning

Constraints the plan respects.
  • Model hazardous-material and segregation constraints
  • Keep process-safety windows on the schedule
  • Account for cleaning and containment time
03

Lab-aware replanning

The plan that sees the lab.
  • Replan production around lab and release testing
  • Sync lab capacity with batch and shipment flow
  • Surface release-timing risk before it slips a shipment
04

Cross-functional resynchronisation

One event, one coordinated replan.
  • Propagate events across production, quality, and maintenance
  • Assess cross-functional impact before committing
  • Configurable response modes, from advisory to automatic
Trust & security

Security and traceability you can verify.

Bodhee runs alongside your existing ERP, MES, and LIMS, with the security controls and audit trail your IT and EHS teams expect. ISO 27001 certifies our whole-organisation information-security management system.

ISO/IEC 27001
Certified ISMS, whole-organisation scope
Audit trail
Append-only, write-once history
Access control
RBAC with SSO and SAML
Encryption
At rest and in transit
Data residency
Customer-specified GCP region
GDPR
Supported, DPA on request

Cloud-infrastructure attestations are inherited from Google Cloud Platform, not claimed as our own. Bodhee complements your process-safety and EHS systems; it does not replace them.

Explore the Trust Center →

Measurable outcomes

What Bodhee delivers in chemical plants.

Ranges observed across process manufacturing deployments. Outcomes vary by plant complexity, data maturity, and integration scope.

0–15 pp

OEE improvement

across process manufacturing deployments

0–25%

Changeover efficiency

from campaign- and changeover-aware sequencing

0–15%

Cross-functional capacity recovery

from synchronised production, QC, and maintenance planning

0–25%

On-time delivery

from more reliable schedule execution

Hours → Minutesrescheduling cycle time−60–80%planner scheduling effort−10–20%wip inventory

Bodhee runs live specialty chemical and process manufacturing production today, across multiple sites and countries. Live deployments, not pilots.

Based on Neewee deployment observations in regulated process manufacturing.

Frequently asked questions

Specialty chemical scheduling, answered.

The questions chemical planners, plant heads, and IT teams ask before a pilot.

01

Specialty chemical scheduling

How Bodhee sequences high-mix chemical campaigns around changeovers, compatibility, and process safety, and fits your systems.

8 questions

Specialty chemical production scheduling software plans and sequences high-mix batch and continuous production across shared reactors and trains, honouring the constraints that make chemical plants hard: product-to-product changeovers and cleaning, grade transitions, material compatibility and segregation, process-safety windows, and lab-release timing. Bodhee does this as , rebuilding a feasible plan continuously as the plant and the lab change.

Ready to schedule your chemical plant as one?

A 30-minute tour of Bodhee for specialty chemical production: the engine, the cross-functional layer, and how it fits your ERP, MES, and LIMS.