Bodhee
Études de cas

Témoignages clients.

Résultats d'usines passées de plannings tableur à un modèle d'usine en direct. Histoires nommées et anonymisées.

A shared-equipment API site freed enough capacity for five extra CDMO batches a year
2.5
Étude de cas·Pharmaceuticals·Europe

A shared-equipment API site freed enough capacity for five extra CDMO batches a year

A major European pharma manufacturer ran commercial and CDMO production on shared equipment, planned in Excel. Bodhee Production Scheduling, deployed as a Control Tower, cut commercial lead time 2.5% and freed capacity for five extra CDMO batches a year.

A multi-line API site running commercial and CDMO production on shared equipment, at a major European pharma manufacturer2.5
Scheduling people, not FTEs: a multi-line API site's path to 20% capacity unlock
20
Étude de cas·Pharmaceuticals·Europe

Scheduling people, not FTEs: a multi-line API site's path to 20% capacity unlock

A multi-line API manufacturing site moved from static Excel scheduling to operator-level allocation on Bodhee — naming the operator, honouring per-shift compliance limits, and using the same model to surface a 20% capacity unlock via what-if scenarios.

A multi-line API manufacturing site of a major European API manufacturer20
Productivity recovered across multiple APUs at a large-scale European API plant
8–12
Étude de cas·Pharmaceuticals·Europe

Productivity recovered across multiple APUs at a large-scale European API plant

How a leading European Active Pharmaceutical Ingredient provider replaced annual sales-projection plans with event-driven, AI-generated schedules across its autonomous production units — measurable productivity gains within 8–12 weeks of go-live.

a leading European Active Pharmaceutical Ingredient provider operating a large-scale, multi-APU commercial site8–12
10–15% Equipment Utilisation Uplift: rebuilding production scheduling at a major European API manufacturer
10–15
Étude de cas·Pharmaceuticals·Europe

10–15% Equipment Utilisation Uplift: rebuilding production scheduling at a major European API manufacturer

A European API manufacturer retired its in-house planner for Bodhee Production Scheduling — lifting equipment utilisation 10–15% and productivity 8–10% once shelf-life, lockstep, and cross-building dependencies entered the model.

A multi-building API manufacturing site of a major European API manufacturer10–15

Votre histoire ici ?

Écrivez-nous — nous publions uniquement avec l'approbation écrite du client pour chaque chiffre.